Objectives- Establish short and long term plans to:
- Evaluate pond status and capacity relative to engineering specifications
- Dredge if necessary
- Repair drain stack
- Remove trees from dam area.
- Aerate if necessary to improve water quality.
Concerns-
- The tennis courts and pond were symbols reflecting the character and beauty of Bristol Corners. Both have fallen into significant disrepair.
- Pond drain stack leaks resulting in low water level, resulting in aggressive invasive plant growth.
- The pond appears to be ecologically dead due to lack of oxygen.
Approach
- Coordinate maintenance with City of Novi, EGLE and subject matter experts.
- Coordinate efforts with wetland/woodland invasive species control/elimination efforts.
- Develop short term actions to evaluate rainwater capacity & fix drain stack.
- Develop long term vision.
- Solicit member input on enhancements, walking path etc.